Your browser version is outdated. We recommend that you update your browser to the latest version.

Building Better Bridges For Life



Video - 12.9m long bridge Double Lane

shows Panel two being installed ..see below

Video below - 19m long Single Lane bridge

Tax payers perspective "better than bailey"

 

Video below - 18.5m long Single Lane Bridge

shows panel one being installed 

Guardian prefab abutments installed before closing road;     then road closed, Pony Truss bridge removed, new prefab bridge installed in 1 day

CWBCWB Guardian Bridge Rapid Construction Inc.

 

 

CWB  Bow String Arch

Low Truss Bow String Arch Elevation and Cross Section

Low Truss Bow String Arch Shown Above

 

 High Truss Bow String Arch Elevation and Cross Section Typical

 High Truss Bow String Arch Shown Above

 

 

One Lane


Width Range: 3m - 5.5m                                                                                                                            

 

Span Range Max: 61m - 40m

Two Lanes


Width Range: 6m - 10.5m         (20 ft. - 34 ft.)

 

Span Range Max: 55m - 48m    (180 ft. - 160 ft.)

Three Lanes


Width Range: 10m - 14m           (35 ft. - 44 ft.)

 

Span Range Max: 48m - 43m      (160 ft. - 140 ft.)

 

 

ELEVATION 

 

elevation

 

 

bow string arch typical cross section

 CROSS SECTION

 

NOTE: Fiberglass composite bridge deck does not require stringers from floor beam to floor beam 

 bow string arch without deck and stringers, use FRP deck to span from floor beam to floor beam

 

 

 

 

 

Fabrication

CSA W59, CSA W47

Certified Welding Bureau

 

Truss Connections:

  • Gusset Plates with ASTM A325 High Strength Bolts (Heavy Hex)
  • Gusset Plates with ASTM A325 Tension Control (Round Head)
  • Gusset Plates with Fillet Welds (1/4" min.)

Floors/Decks:

  • Fiberglass Composite + Asphalt or Micro Slurry
  • Fiberglass Composite + Epoxy Aggregate or PolyMethylacrylate Aggregate (12mm)
  • Corrugated Steel Planking + Asphalt
  • Gang Nailed Timber Planking
  • Gang Nailed Timber Planking + Asphalt
  • Glue Laminated Timber deck + Asphalt
  • Concrete Slab on Removable Forms
  • Concrete Slab on Fiberglass Stay-in-Place (SIP) Forms
  • Concrete Slab on Steel Stay-in-Place (SIP) Forms

Railing:

  • Various Truss or Slab Mounted Rails
  • Curb-mounted rails

Corrosion Protection:

  • Fiberglass Composite Encapsulated
  • Galvanizing
  • Galvanizing + 2-Coat Paint
  • 3-Coat Paint
  • Weathering Steel