Fiberglass Composite Since 1994



Video - 12.9m long bridge Double Lane

shows Panel two being installed ..see below

Video below - 19m long Single Lane bridge

Tax payers perspective "better than bailey"

 

Video below - 18.5m long Single Lane Bridge

shows panel one being installed 

Guardian prefab abutments installed before closing road;     then road closed, Pony Truss bridge removed, new prefab bridge installed in 1 day

CWBCWB Guardian Bridge Rapid Construction Inc.

 

 

Permanent Bridges

 

Double lane bridge ...27m long x 9.5m wide

 

 one bridge panel prefabricated rigged and being set in place

  

 

 

 

 

side view

 27m long using two cranes to set two lane bridge in place in one day

 

 

 

 

  

  two bridge panels  each 4.75m wide x 27m long

 longitudinal joint permanently joins bridge panels 

 

 

 

 

 elegant structures installed using rapid construction  

 

 

 

 

 27m long x 9.5m wide completed in less days than concrete 

saving time important to local residents within this growing residential community

 

 ++++++++++++++++++++++++++++++++++++++++++++++++++++

 

 

more examples noted below

 

 

 Fiberglass composite bridge deck on steel beams

approx. 9m long x8m wide

replaced single lane bridge with double lane

rehab existing abutments, cantilever

delivered two bridge panels on one truck

installed using crane

Four men crew set bridge in place in one hour

new approach slabs

road works, paving

on time and budget

all works on site completed in 7 days

 

 +++++++++++++++++++++++++++++++++++++++++++++++++++++

 

Fiberglass composite bridge deck on steel beams

approx. 15m long x 8 m wide

replaced single lane bailey bridge

new prefab abutments

new prefab modular bridge two units

manufactured off site

delivered two bridge panels on one truck

installed using crane

four men crew set bridge in place in one hour

road works, paving

completed in 10 days on site

 

 +++++++++++++++++++++++++++++++++++++++++++++++++++++

 

 Fiberglass Composite "Double Tee" Panel

approx. 10m long x 8m wide

replaced single lane bridge

rehab abutments, cantilever

new prefab modular double tee panels

delivered two panels on one truck

installed using crane

four men crew set bridge in place in one hour

approach slabs, road works

completed in 10 days on site

 

 

 +++++++++++++++++++++++++++++++++++++++++++++++++++++

 

 

Fiberglass composite bridgedeck/Steel Girder

 

 

 +++++++++++++++++++++++++++++++++++++++++++++++++++++

 

 Fiberglass composite bridgedeck/Steel Girder

 

 

panel one

 

 

 

panel two

 

 

 

 

++++++++++++++++++++++++++++++++++++++++++++++++++++