Building Better Bridges For LIfe
Video below - 19m long Single Lane bridge
Tax payers perspective "better than bailey"
Video below - 18.5m long Single Lane Bridge
shows panel one being installed
Guardian prefab abutments installed before closing road; then road closed, Pony Truss bridge removed, new prefab bridge installed in 1 day
CWB
Certified Welding Bureau
Welding Instructor
Welding Inspector
3rd Party Welding Engineer Retainer
ASME.org
American Society of Mechanical Engineers
ANSI - American National Standards Institute
Collaboration with Jia Xue Ph.D
Example of Rail Bridges Through Plate Truss
some designs will allow for steel plate floor and ballast
| CarbonEvery cubic meter of Guardians fiberglass Composite captures or sequesters one tonne (2,200 pounds) of CO2 | 500 James Street South St. Marys Ontario Canada |
© 2014. Guardian Bridge Rapid Construction Inc.. All Rights Reserved. Canadian and US Patents Protected.