Building Better Bridges For Life



Video - 12.9m long bridge Double Lane

shows Panel two being installed ..see below

Video below - 19m long Single Lane bridge

Tax payers perspective "better than bailey"

 

Video below - 18.5m long Single Lane Bridge

shows panel one being installed 

Guardian prefab abutments installed before closing road;     then road closed, Pony Truss bridge removed, new prefab bridge installed in 1 day

CWBCWBCSCE / SCGC

Certified Welding Bureau

Welding Instructor

Welding Inspector

3rd Party Welding Engineer Retainer

Western University

Collaboration with Jia Xue Ph.D 

 

 

 

 

 

 

 

 4m wide inside rails
Pedestrian load
80kN maintenance load4m wide inside rails Pedestrian load 80kN maintenance load