Video - 12.9m long bridge Double Lane

shows Panel two being installed ..see below

Video below - 19m long Single Lane bridge

Tax payers perspective "better than bailey"

 

Video below - 18.5m long Single Lane Bridge

shows panel one being installed 

Guardian prefab abutments installed before closing road;     then road closed, Pony Truss bridge removed, new prefab bridge installed in 1 day

CWBCWBCSCE / SCGC

Certified Welding Bureau

Welding Instructor

Welding Inspector

3rd Party Welding Engineer Retainer

ASME.orgASME.org

American Society of Mechanical Engineers

ANSI - American National Standards InstituteANSI - American National Standards Institute

PFS·TECO

STANDARDS COUNCIL OF CANADA

INTERNATIONAL ACCREDITATION SERVICE

Western University

Collaboration with Jia Xue Ph.D 

 

Shipping a bridge is considered during the concept stage, prior to preliminary drawings as the fiberglass composite elements are modular in width and length.

 

 

Examples

 

 

 

 

 

 

 

 

 

 

 

General Contractors 

During the bid process Guardian will provide a estimated or approx weight and the General Contractor will be solely responsible to account for 10% more additional weight for their pickup, shipping, installing the bridge.