Video - 12.9m long bridge Double Lane

shows Panel two being installed ..see below

Video below - 19m long Single Lane bridge

Tax payers perspective "better than bailey"

 

Video below - 18.5m long Single Lane Bridge

shows panel one being installed 

Guardian prefab abutments installed before closing road;     then road closed, Pony Truss bridge removed, new prefab bridge installed in 1 day

CWBCWBCSCE / SCGC

Certified Welding Bureau

Welding Instructor

Welding Inspector

3rd Party Welding Engineer Retainer

ASME.orgASME.org

American Society of Mechanical Engineers

ANSI - American National Standards InstituteANSI - American National Standards Institute

PFS·TECO

STANDARDS COUNCIL OF CANADA

INTERNATIONAL ACCREDITATION SERVICE

Western University

Collaboration with Jia Xue Ph.D 

"on Time & Budget"

  • means that a fabrication date will be provided to the client that is based on our suppliers delivery dates over which Guardian has no control and/or,
  • when the suppliers materials are delivered they are also subject to review, approval by Guardian prior to fabrication,
  • in the case of steel it is subject to mill tests reports being in conformance, approval by Guardian and its third party engineer prior to fabrication, 
  • if the materials or material test reports  are found to be defective,  then delays beyond the control of Guardian will more than likely result and corrective steps will be taken to conform to the design stamped shop drawings