Your browser version is outdated. We recommend that you update your browser to the latest version.

Building Better Bridges For Life



Video - 12.9m long bridge Double Lane

shows Panel two being installed ..see below

Video below - 19m long Single Lane bridge

Tax payers perspective "better than bailey"

 

Video below - 18.5m long Single Lane Bridge

shows panel one being installed 

Guardian prefab abutments installed before closing road;     then road closed, Pony Truss bridge removed, new prefab bridge installed in 1 day

CWBCWBCSCE / SCGC

Certified Welding Bureau

Welding Instructor

Welding Inspector

3rd Party Welding Engineer Retainer

Western University

Collaboration with Jia Xue Ph.D 

 

 

The sides of the bridge, abutments, wing walls can be finished with the following composite stone configurations

 

 

Field Stone

 Field Stone

 

Athabasca Ledge Rock

 Athabasca  Ledge Rock

 

franklin ledge rock

Franklin Ledge Rock

 

Georgian Brown

 Georgian Brown

 

Huron county Stone

 Huron County Stone

 

Laurentian Stone Ledge Rock

 Laurentian Ledge Rock

 

Montana Stone

 Montana Stone

 

Muskoka Stone

 Muskoka Stone

 

stacked rock

 Stacked Rock Stone

 

 

 

 

 Fiberglass Composite Wood Grains

 

for transforming into wood glulam structure without the maintenance

 

 African Safari